From: route@monster.com
Sent: Thursday, April 07, 2016 11:48 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
PROFESSIONAL SUMMARY Vilma
Viera
Senior Scheduler / Civil Engineer
EDUCATION Bachelor
of Science in Civil Engineering -
Polytechnic University of Puerto Rico in San Juan
Associate
Degree in Civil Engineering -
University of Puerto Rico in Ponce Associate
Degree in Architectural Delineation -
University of Puerto Rico in Ponce SUMMARY OF EXPERIENCE Over ten (10) years
of experience in industrial construction, transportation construction and
government construction. Specific industry experience Nuclear Power,
Life Sciences, Manufacturing, Railway systems, and Government. I have held
skills in project controls, procurement of materials, and performance
engineering. Contract types include:
Lump Sum-Turn Key, Lump Sum, Guaranteed Max and Cost Reimbursable. Execution
approach includes: Construction Management. SIGNIFICANT EXPERIENCE FLUOR
(2011 to Present) PROJECT CONTROLS SPECIALIST IV Project Name
(North Anna 3
Project)
Client (Dominion) Dates (November
2011
–present)
Location (Charlotte,
NC) Type of
project (Lump
Sum)
Size of Project/TIC ($7.2 B) Execution Approach (EPC)
Industry (Nuclear Power) Lead the Procurement and Transition Planning effort for the
North Anna3 Project. Responsible for coordinating Alignment Meetings
between Engineering and Procurement. Maintain Weekly status updates of the
Integrated Implementation Schedule and the Procurement Schedule. Send
Weekly Status Reports to responsible disciplines. HIGH BRIDGE ASSOCIATES, Oconee Nuclear Station (3-850MW) (2009 to 2011) SENIOR PROJECT
SCHEDULER Project Name
(Oconee Nuclear Station Tornado/HELB Project) Client (Duke
Energy) Dates (April
2009–November
2011)
Location (Salem,
SC) Type of
project (Cost
Reimbursable)
Size
of Project/TIC ($234 M) Execution Approach (EPCV
Management)
Industry (Nuclear Power) Integration
of Work Order tasks into the on-line and outage plant schedules using Artemis
Project View Software. Develop
and maintain the P6 project schedule and a Project View plant schedule for
the Tornado-HELB project. The scope entails design, planning, implementation
and closeout phases of the project as well as procurement. Main
responsibilities include: schedule integration between the utility and major
subcontractors; scheduling the implementation of Design Scopes Plans; and
publishing project reports & schedules on periodic basis. FLUOR
(2003 to 2009) PROJECT CONTROLS SPECIALIST IV Project Name
(Oconee Nuclear Station Tornado/HELB Project) Client (Duke
Energy) Dates (February
2008 – April
2009)
Location (Salem,
SC) Type of
project (Cost
Reimbursable)
Size
of Project/TIC ($234 M) Execution Approach (Procurement and
Construction) Industry
(Nuclear Power)
Pre-plan
DCP schedules with Superintendents and Engineering Planners in order to
support the implementation pre-planning effort. Resource load schedules
per the estimate and generate progress plans which includes manpower curves. Attend
and chair weekly update meetings and interface with Engineering leads,
Construction Engineers/Superintendents, and management as required developing
and maintaining the baseline and current schedule. Maintain
daily status updates for implementation scope in progress. Status
should be integrated with the Oconee Major Projects (OMP) Master Schedule
according to the scheduling guidelines published by OMP. Train and
support junior-level Field Planners. PROJECT CONTROLS SPECIALIST IV Project Name
(Cidra Capacity Compliance
Project)
Client (GlaxoSmithkline) Dates (December
2007-February
2008)
Location (Cidra, Puerto Rico) Type of
project (Lump sum –
turn key
contract)
Size of Project/TIC ($120 M) Execution Approach (EPCV
Management)
Industry (Life Sciences)
Managed
the Closeout of over 365 subcontracts on a project approaching
completion. This role included: Implementing the full Fluor Daniel
contract closeout procedure, overall management of a small closeout team,
auditing of every closed contract, to ensure it complied with all statutory
and legal requirements and archiving of close contracts. PROJECT CONTROLS SPECIALIST IV Project Name
(Desflurane
Project)
Client (Baxter) Dates (2007)
Location (Guayama, Puerto Rico) Type of
project (Lump sum –
turn key
contract)
Size of Project/TIC ($120 M) Execution Approach (EPCV
Management)
Industry (Life Sciences)
Develop Work Breakdown Structures for project
integrity of work defined by the contract. Recommends solutions or recovery
plans to schedule impact or delays. Analyze variances in schedule performance against
the plans to Project Management. Assist in Monthly Reporting of Schedule
progress, and Scheduling reports. Resource load schedule to develop progress
curves. Responsible for planning, scheduling, and progress. Responsible for
the development and maintenance of project schedules (P3), including baseline
or target schedule. Establish
the level of schedules to be prepared to manage the project, update and issue
them on a weekly basis with an assessment write-up. Propose
Recovery/Mitigation Plans. Analyze and evaluate critical and near
critical activities. Float analysis. Provide schedule impact analysis and
mitigation/recovery plans for: density, delay, disruption, overtime and
weather events. Contribute to the proposal efforts for scheduling
activities. Support the Project Manager as required. PROJECT CONTROLS SPECIALIST IV Project Name
(Project
Parent)
Client (GPSG) Dates (2005-2006)
Location (Gurabo, Puerto Rico) Type of
project (GMA contract)
Size of Project/TIC ($90 M) Execution Approach (PCV
Management)
Industry (Life Sciences) Developed
Work Breakdown Structures for project integrity of work defined by the
contract. Recommends solutions or recovery plans to schedule impact or
delays. Develop and supports the execution of procurement and
construction schedules. Weekly update and ensure no deviations to
schedule management SOP instructions of vital importance for monthly schedule
re-integration of construction & commissioning schedule. Ensures
accuracy of actual progress reflected within the monthly updates for procurement
and construction activities. Works with procurement and construction
teams to refine interdependent activities and sequencing. Develop and
supports the execution of commissioning schedule. Ensures accuracy of
actual progress reflected within the monthly updates for commissioning
activities. Works with qualification and systems teams to refine
interdependent activities. Issues monthly analysis of procurement,
construction and commissioning schedules. Analyze variances in schedule
performance against the plans to Project Management. Assist in Monthly
Reporting of Schedule progress, and Scheduling. Resource load schedule
to develop progress curves. Overall responsible for planning, scheduling, and
progress. Responsible for the development and maintenance of project
schedules (P3), including baseline or target schedule. Establish
the level of schedules to be prepared to manage the project, update and issue
them on a weekly basis with an assessment write-up. Propose
Recovery/Mitigation Plans. Analyze and evaluate critical and near
critical activities. Float analysis. Provide schedule impact analysis and
mitigation/recovery plans for: density, delay, disruption, overtime and
weather events. Support
the Project Manager as required. PROJECT CONTROLS SPECIALIST IV Project Name
(Spectrum and Viviant
Projects)
Client (Wyeth) Dates (2004)
Location (Guayama, Puerto Rico) Type of
project (cost
reimbursable)
Size of Project/TIC ($290 M) Execution Approach (EPCM Management)
Industry (Life Sciences) Develop Work Breakdown Structures for project
integrity of work defined by the contract. Recommends solutions or recovery
plans to schedule impact or delays. Analyze variances in schedule performance against
the plans to Project Management. Assist in Monthly Reporting of Schedule
progress, and Scheduling. Resource load schedule to develop progress
curves. Overall responsibility for planning, scheduling, and progress.
Responsible for the development and maintenance of project schedules (P3),
including baseline or target schedule. Establish
the level of schedules to be prepared to manage the project, update and issue
them on a weekly basis with an assessment write-up. Propose
Recovery/Mitigation Plans. Analyze and evaluate critical and near
critical activities. Float analysis. Provide schedule impact analysis and
mitigation/recovery plans for: density, delay, disruption, overtime and
weather events. Coordinate with Procurement and Engineering for drawing and
equipment delivery schedules. Provide direct supervision to a small team of
Project Controls personnel. Support
the Project Manager as required. PROJECT CONTROLS SPECIALIST IV Project Name
(Indiplon
Project)
Client (Pfizer) Dates (2003)
Location (Barceloneta, Puerto Rico) Type of
project (cost plus
reimbursable)
Size of Project/TIC ($17 M) Execution Approach (CM
Management)
Industry (Life Sciences) In charge of the Project Monthly Reporting of
progress and Scheduling. Develop Work Breakdown Structures for project
integrity of work defined by the contract. Recommend solutions or recovery
plans to schedule impact or delays. Analyze variances in schedule
performance against the plans to Project Management. Resource load schedule
to develop progress curves. Overall responsibility for planning, scheduling,
and progress. Responsible for the development and maintenance of project
schedules (P3), including baseline or target schedule. Establish the level of
schedules to be prepared to manage the project, update and issue them on a
weekly basis with an assessment write-up. Propose Recovery/Mitigation
Plans. Analyze and evaluate critical and near critical activities.
Float analysis. Provide schedule impact analysis and mitigation/recovery
plans for: density, delay, disruption, overtime and weather events.
Coordinate with Procurement and Engineering for drawing and equipment
delivery schedules. DMJM + Harris (1997 – 2003)
SENIOR SCHEDULER Project Name (Tren Urbano
Project)
Client (DOT of Puerto Rico) Dates (1998-2003)
Location (San Juan, Puerto Rico) Type of
project (cost plus
reimbursable/
Size of Project/TIC ($2.25 B) Execution Approach (Program
Management)
Industry (Transportation) In charge of the analysis, review and recommendation
for acceptance of Subcontractor’s baseline CPM Schedule. Responsible
for monitoring and reporting the progress of the project to Top Management.
Identify and inform schedule status, issues and work around alternatives to
program management, prepare schedules graphics and metrics presentations.
Review and evaluation of subcontractors request for payments and schedule of
values. Monitor Schedule progress and cost control. Develop, implement,
and maintain control measures of planning and scheduling. Evaluate
progress reports. Analyze potential claims and their impact to the project
schedule. Able to integrate Contractors schedules into a master
program, analyzing overall integrated schedule and individual impact. Ensure
program schedules are integrated with budget plans. Fermin Gonzalez, Inc (1995 – 1997)
PROJECT ENGINEER Project Name (US Coast Guard Family
Housing)
Client (US Coast Guard) Dates (1995-1997)
Location (Guaynabo, Puerto Rico) Type of
project (lump sum/cost
plus
reimbursable)
Size of Project/TIC ($750 M) Execution Approach (Construction
Management) Industry (Federal Government) Elaborate
and maintain the project schedule. Analyze potential claims and their impact
to the project schedule. Prepare and propose submittals. In charge of
purchase of material and equipment. Elaborate deviations and change
orders to be submitted to the owner. Review and approve sub-contractors
payments. Elaborate
and maintain of As-built drawings. Prepare monthly billing to the
owner. TRAINING Advanced Risk Analysis with Primavera Risk (02/2012) Primavera P6 Project Management (2011) Artemis Project View. (2010) Primavera v.5.0 (P3e/c), Primavera Project
Management End User and Administrator Training Course: CPM Solutions Ltd.,
Greenville, SC, USA (June 26 - 29, 2006) Training program P3 for windows, P3 and training
program reports and graphics; Evans Technology, Inc. Roswell, Georgia, USA
(1996) Advanced Risk Analysis with Primavera Risk
(02/2012) |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Fluent |
|
|
|